Reuse Building Materials
The industry generates 230 tonnes of construction and demolition waste annually – about 55 % of all German waste. Given these numbers, new builds are no longer in keeping with the times. Instead, we need to ask how we can use existing building stock as a resource, reusing bricks, windows, or facade pieces. If the aim is net zero, demolition and landfill disposal must be avoided at all costs. Today, a progressive architecture is one that takes part in the circular economy and reuses building materials.
This issue presents buildings designed with this in mind: Powerhouse Company’s Floating Office in Rotterdam can be moved as a whole or disassembled into reusable elements. In Basel, Baubüro in mainly used recycled building components to refurbish and extend the Elys cultural and commercial building. In Amsterdam, Cepezed designed a temporary courthouse whose dismantling and relocation were planned from the outset. Our special Green section rounds out this look at the circular economy by addressing buildings’ energy consumption.
Reviews
There are no reviews yet.